More kitchen progress

Posted on Tue, 25 Nov 2008 by KiM

This blog chronicles my entire kitchen renovation from start to finish. Greentea Design has provided me with their solid wood kitchen cabinets, and I’m taking care of the rest.

If you’d like to be brought up to date, check out my kitchen remodel blog for an archive of previous posts. I posted recently about the arrival of the cabinets, and now for the arrival of the appliances and some other odds and ends that have been completed.

Since my last post things have been moving along in my kitchen. The end is near and I could not be happier with the way the space has turned out, and I am dying to cook my first meal in probably 6 weeks. This post is going to be a bit random, of different projects that have progressed, and next time I’ll show you details of the lighting.

Let me start with the arrival of the appliances. I was so stoked to see them in the kitchen. To finally have a fridge that has a freezer in it…to be able to have ice in my drinks without having to go down to the chest freezer in the basement and bash a bag of ice on the ground. It was a scary sight to see them being moved into the house though, let me tell you. The movers removed all the packaging and then carried them into the house, through my narrow front door in the pouring rain up my rickety steps. I held my breath. The stove, I was told, weighs about 500 lbs. Amazingly, it survived the trip into the house. It was left in the middle of the floor while it awaited the gas guy’s visit for the hook up.



The uppers were installed, in about 15 minutes, while I was upstairs locked in my bedroom with the cats. LOVE EM.


Here is a photo of the kitchen with the uppers in place and, well, at least the fridge in place.

To see more of the progress, click HERE.

Leave a Comment

Your email address will not be published.
Required fields are indicated by *